One version of Misfit Hollow, frozen so it couldn’t change mid-review. Provider names are left out. Anything blocked or put off stays amber.
- Stage 1
Check who can run
Ten agents were requested. Seven could run and three were blocked, and none of the blocked ones launched.
- Stage 2
Seven separate reviews
Seven agents reviewed the app without seeing each other’s work. Two coordinators organized them but didn’t review the product. Together they found 18 problems or missing tests.
- Stage 3
One list, no voting
The seven reports became one list. A finding made the list only if it could be reproduced and pointed to a file and line, not because several agents agreed.
- Stage 4
Four repair agents, no overlap
Four repair agents (server, interface, domain, and packaging and tests) changed nine files between them without touching each other’s, and handed back fixes rather than installing anything.
- Stage 5
Test the combined fix
86 of 86 Python checks and 49 of 49 browser checks passed on the combined version.
- Stage 6
A separate final check
A separate reviewer checked only the repairs and passed them, with limits. Two risks were put off on purpose. The fixed version passed its checks but wasn’t installed in this run.
The same run as a timeline →